The Engineering Division works to ensure that the Town’s current and future infrastructure needs are met. Infrastructure needs include roadways, sidewalks, sewer, water, and storm water. This is accomplished through Capital Improvement Program management, analysis, design, and construction; private development related reviews to ensure compliance with Town codes and standards; construction inspections of public and private projects and drainage and right-of-way inspections; monitoring of transportation and traffic management issues; and administration and protection of the Town’s floodplain areas.
Engineering
Physical Address:
1001 Cross Timbers Road, Suite 2330
Flower Mound, TX 75028
Mailing Address:
2121 Cross Timbers Road
Flower Mound, TX 75028